Posts

Production Schedule

Image
 I have compiled together a schedule that spans from January 8th 2024 to 16th February 2024 covering both the production and post-production process. I did this by inserting the tasks I had to complete and corresponding it to an estimated time span going down. This results in the final film having all expected features as I can use this as a reminder of what I need to do that day/week.

Contingency Plan

Image
  I have put together a contingency plan to prevent any set backs/problems from either occurring or getting out of hand. I've designated all situations with a rank of how likely an event is of happening to prioritise correctly. I planned out different ways of preventing these circumstances to keep the film on track for it's release. This ultimately will result in a film more likely being filled with less inconsistencies and releasing in as a well made production.

Equipment Booking

Image
  I have created a table of all equipment needed for my short film. I have done this to get a better understanding of the equipment I'll need for the film to help when it comes to filming days. I did this by looking through my shot list and seeing what I will need for each scene. Once I decided what I required I looked through different websites to find what I was looking for. I have decided to hire most equipment where easiest. This should help the final film hold a consistent level of standards/quality.

Call Sheet

Image
  I have constructed a call sheet to have a full understanding of who needs to be where at what times when it comes to filming day. I did this by overlooking a scene a wish to film on that day and filling in the necessary information. This should help the final film release on time as I am more organised and so are the cast and crew.

Shot List

Image
I have chosen to create a shot list to with planning out scenes and the order for shooting them. I have done this by listing numbered scenes and adding details of where the scene takes place and who/what needs to be there. I followed this up by giving a general description of the scene. By doing this the final film should be more consistent as for when I return to the same location. 

Cast and Crew

Image
I have completed tables of information to do with my cast and crew to fully realise what roles needed filling. I did this by asking close friends of mine if they were willing to be in my film as a cast member. Once I had done this I asked them for their information and put it into tables where applicable. This helps the final film have a select cast and everyone can get into character as they have fully decided roles.

Risk Assessment

Image
 

Location Permission

Image
 

Location Recce

Image
  I have created a location recce to fully examine the factors surrounding where I've chosen to film. To do this I had to research the location and the area around it getting information vital to the filming process. The final film as a result should be more likely to be filmed well as I'm not debating different locations to use.